- Acronym:
- EGEE-III
- Logotyp:
-

- Duration:
- 1.04.2008 - 1.04.2010
- Aim:
- Within the EGEE-III project preparations were started for the establishment of a permanent, stable organizational structure, in cooperation with state NGI (National Grid Infrastructures) structures and EGI_DS (European Grid Infrastructure Design Study) project, under the 7th Framework Programme.
- Contact:
- e-mail: cyfronet (at) cyfronet.pl, phone: (+48 12) 632 33 55